Browse Items (4846 total)

20170106_102129.JPG
Cutting spruce plantation. The 'feller buncher' with one operator has been working for about 1.5 hours; he has taken down about 50 trees or so. The machine can cut a 12-inch tree in about 1 second! This is extremely efficient timber harvesting!

20170106_143209.tif
Spruce logs from spruce plantation have been cut and stacked. They are to be skidded to a central location for further processing.

20170106_143458.tif
Logs are in queue for further processing. The picker is picking up clean boughs for chipping. The ships will be used to generate steam at Cooley Dickenson Hospital in Northampton.

20170113_142156.tif
The spruce plantation has been removed using a 'feller buncher'. The logs have been removed from the site. The green needles on the ground will decompose. It will be necessary either to graze a few goats in the cut area, or plan to brush hog the…

20170113_142532.tif
The spruce plantation has been cut. The logs are queued for further processing. The pollards are stacked for chipping. These tree-tops are clean, they will be chipped for burning as bio-mass at the Cooley Dickenson Hospital in Northampton.
Our dog…

20170113_142900.tif
Spruce logs have been cut to length and loaded into a truck for transportation to a saw mill. These logs will be used for building a log cabin.

20171203_140056.jpg
Sign on doorway to S. Worthington Methodist Church

20171203_140211.jpg
Alter and pews, S. Worthington Methodist Church

20171203_140232.jpg
Ante room and pews, S. Worthington Methodist Church

20171203_140239.jpg
Manual air organ, S. Worthington Methodist Church

20171203_140245.jpg
Anteroom and pews, S. Worthington Methodist Church

20171203_140316.jpg
Lectern, S. Worthington Methodist Church. Note drip collection facility below smoke ducts from heating stoves.

20171203_140505.jpg
Alter, pews and stove ducting, S. Worthington Methodist Church

20171203_140746.jpg
Balcony pews, S. Worthington Methodist Church. These are located at the SE end of the bulding.

20171203_140754.jpg
Pews and alter, S. Worthington Methodist Church

20171203_140842.jpg
Bussey, McLeod Company, Troy, NY, wood stove, S. Worthington Methodist Church. This is one of two similar units, this one located on the SW side of the sanctuary.

20171203_141028.jpg
Evan Spring playing organ, S. Worthington Methodist Church

20171203_141104.jpg
Pews and rear of the S. Worthington Methodist Church

20171203_141621.jpg
Part of iron support structure and bell, S. Worthington Methodist Church

20171203_141626.jpg
Part of bell mechanism and underside of steeple, S. Worthington Methodist Church
Output Formats

atom, dc-rdf, dcmes-xml, json, omeka-xml, rss2