Browse Items (5011 total)

Part of interior structure of bellfry, S. Worthington Methodist Church

Stair in bellfry leading to trap door to access bell, S. Worthington Methodist Church

Schrades house and 'Academy' in S. Worthington from S. Worthington Methodist Church bellfry.

Part of support beam for bell, S. Worthington Methodist Church

Part of bell mechanism and underside of steeple, S. Worthington Methodist Church

Part of iron support structure and bell, S. Worthington Methodist Church

Pews and rear of the S. Worthington Methodist Church

Evan Spring playing organ, S. Worthington Methodist Church

Bussey, McLeod Company, Troy, NY, wood stove, S. Worthington Methodist Church. This is one of two similar units, this one located on the SW side of the sanctuary.

Pews and alter, S. Worthington Methodist Church

Balcony pews, S. Worthington Methodist Church. These are located at the SE end of the bulding.

Alter, pews and stove ducting, S. Worthington Methodist Church

Lectern, S. Worthington Methodist Church. Note drip collection facility below smoke ducts from heating stoves.

Anteroom and pews, S. Worthington Methodist Church

Manual air organ, S. Worthington Methodist Church

Ante room and pews, S. Worthington Methodist Church

Alter and pews, S. Worthington Methodist Church

Sign on doorway to S. Worthington Methodist Church

Spruce logs have been cut to length and loaded into a truck for transportation to a saw mill. These logs will be used for building a log cabin.

The spruce plantation has been cut. The logs are queued for further processing. The pollards are stacked for chipping. These tree-tops are clean, they will be chipped for burning as bio-mass at the Cooley Dickenson Hospital in Northampton.
Our dog…
Output Formats

atom, dc-rdf, dcmes-xml, json, omeka-xml, rss2